Beginning Saturday, April 30 at 5 a.m. and concluding Sunday, May 1 at noon, VUMC Facilities Management will be conducting crane operations at the end of Stevenson Center Lane adjacent to the loading dock of the Stevenson Center. This will impact both pedestrian and vehicle traffic, and for the safety of all pedestrians and vehicles the area will be closed to all traffic during this time.
Road and pedestrian barricades will be removed as soon as the work has been completed.
Those who park in this area should remove all vehicles before 5 a.m. April 30.