June 15, 2001

Topping-Out Party

Featured Image

The constructon crew working on MRB III held a topping-out party recently after construction of the building reached the highest point. Fred Deweese, top, with Centex Construction, speaks to the crew. (photos by Mary Donaldson)

Foreman David Poole watches as a tree is lifted to the top of  the building. The landmark project — a 350,000-square-foot facility designed to promote connections between diverse scientific disciplines — is a joint undertaking of the College of Arts and Science and the School of Medicine. The entire project is expected to be completed in March 2003.

Foreman David Poole watches as a tree is lifted to the top of the building. The landmark project — a 350,000-square-foot facility designed to promote connections between diverse scientific disciplines — is a joint undertaking of the College of Arts and Science and the School of Medicine. The entire project is expected to be completed in March 2003.